Project Description
- Dublex CM upgraded from 6.x to 8.x
- System manager 8.x installed and restored
- SM1 and SM2 8.x upgraded
- AES 8.x installed and configured
- Messaging upgraded
- Bonn S8300 LSP CM 8.x and BCM 8.x upgraded
- Duisdorf S8300 LSP CM 8.x and BCM 8.x upgraded
- Mallersdorf S8300 LSP CM 8.x and BCM 8.x upgraded
- Waldkirch S8300 LSP CM 8.x and BCM 8.x upgraded
- Leer S8300 LSP CM 8.x and BCM 8.x upgraded