Project Description

  • Dublex CM upgraded from 6.x to 8.x
  • System manager 8.x installed and restored
  • SM1 and SM2 8.x upgraded
  • AES 8.x installed and configured
  • Messaging upgraded
  • Bonn S8300 LSP CM 8.x and BCM 8.x upgraded
  • Duisdorf S8300 LSP CM 8.x and BCM 8.x upgraded
  • Mallersdorf S8300 LSP CM 8.x and BCM 8.x upgraded
  • Waldkirch S8300 LSP CM 8.x and BCM 8.x upgraded
  • Leer S8300 LSP CM 8.x and BCM 8.x upgraded